displacement n. 1.轉(zhuǎn)位,移動;取代,置換;(人的)流離失所。 2.撤換,免職。 3.【機械工程】(活塞)排氣量;【航?!颗潘俊惨话阒杠娕灥呐潘?;商船的排水量一般用 gross [net] ton(nage)〕。 4.【化學(xué)】置換(作用),取代(作用);【物理學(xué)】位移;【醫(yī)學(xué)】移位;【生物學(xué)】替位;【藥學(xué)】濾過;【地質(zhì)學(xué);地理學(xué)】(斷層)移動。 displacement nitration process 【化學(xué)】取代硝化。
maximum n. (pl. maximums, -ma ) 極點,最大,最高,最高額,最大值;最高點;最大限度;【數(shù)學(xué)】極大(值)(opp. minimum)。 The excitement was at its maximum. 興奮到極點。 adj. 最大的,最高的,頂點的,最多的。 maximum draught [draft] 【航海】最大吃水深度。 maximum obscuration 【天文學(xué)】蝕甚。 a maximum range 最大射程。 a maximum thermometer 最高溫度計。
Study on the maximum displacements of bilinear system based on instantaneous input energy method 基于瞬時能量的雙線性系統(tǒng)最大位移研究
Analysis of the maximum displacement of isolation layer for base - isolated buildings with rubber bearings 建筑隔震橡膠支座的安裝質(zhì)量控制
The maximum displacement value is 0 . 5 - 1 . 5 times as much as the thickness of the glass 風(fēng)擋玻璃受鳥撞擊時的位移最大值達厚度的0 . 5 1 . 5倍。
The simulating results showed that maximum displacement and stress is affected by structure lengths 模擬結(jié)果為地道橋結(jié)構(gòu)設(shè)計提供了可靠的分析依據(jù)。
The results are that the maximum displacement and maximum stress occurs at initial time and the maximum stress is less than permissible stress 結(jié)果表明,結(jié)構(gòu)最大應(yīng)力和最大位移均發(fā)生在初始時刻,最大應(yīng)力小于許用應(yīng)力。
The smaller the stiffness and the bigger the mass and the damp is , the smaller the effect of static load on the maximum displacement is 建議以較為簡單的無初始靜力荷載效應(yīng)時的瞬時動力響應(yīng)作為結(jié)構(gòu)設(shè)計依據(jù),其結(jié)果趨于安全。
It is shown that distribution of dynamic response of dam is mainly alike . the maximum acceleration , the maximum displacement and the maximum shear stress are different obviously 可以看出,兩種方法算得的壩體動力反應(yīng)分布規(guī)律基本一致,但壩體的峰值加速度、峰值位移及峰值動剪應(yīng)力等均有明顯的差別。
Contracted with the calculations of dam in rigid foundation , the frequencies are lesson and periods of dam are lengthened because of elastic restraint of foundation . and under earthquake load , the maximum displacement of dam top is larger 與剛性地基下壩體計算結(jié)果相比,由于地基的彈性約束作用,壩體的自振頻率降低,周期延長;且在地震荷載作用下,壩頂最大動位移增大。
It was shown that the maximum displacement occurred on the tunnel axis when one tunnel was excavated , while the maximum value happened near the shallow tunnel and between the area of two tunnels when two adjacent tunnels were excavated at the same time 分析結(jié)果表明:單條隧道開挖引起的地表最大沉降值出現(xiàn)在隧道軸線的正上方,而兩左右或上下相鄰隧道開挖的地表及土層內(nèi)部的最大沉降值則出現(xiàn)在兩隧道的縱軸線之間,且偏向上方埋深較淺的隧道。
The results proved that : ( 1 ) because of the material ' s difference of primer - 9 and primer - 5 , the maximum stress of primer - 5 is larger than primer - 9 but the maximum displacement is smaller than primer - 9 . ( 2 ) because of the unrenewable shape changing of primer - 9 after impacting by the pin , it will cracking under high pressure more easily . so , the paper give the suggestion that the designer should decrease the depth of impacting by pin in the case of the primer be fired successfully 對底- 9底火、底部被擊針撞擊后的第- 9底火和底- 5底火在膛壓作用下分別進行了有限元數(shù)值分析,計算表明: ( 1 )底- 5底火底部擊針撞擊部位為火帽座,其材料為鋼帶,底- 9底部承受撞擊部位為底火體,其材料為冷拉退火圓鋼,由于材料強度不同,承受壓力能力和變形能力不同:雖然在膛壓作用過程中底- 5底火的最大應(yīng)力值比底- 9底火的大,但底- 5底火的最大位移量卻比底- 9底火的小得多。